Fuyuan Southwest Cement Plant, located in southwest China’s Yunnan Province, is a 7,000tpd cement clinker production line, supported by a 12MW pure low-temperature waste heat power generation station and quarry. The project was constructed by Sinoma on EPC basis and put into operation in November 2022. With an annual capacity of 2.1 million tons of clinker and 3.3 million tons of cement, it can process over 500,000 tons of industrial waste residues, fly ash, desulfurized gypsum, and coal gangue, turning industrial waste into valuable resources. This contributes actively to the development of the regional circular economy and environmental protection. Furthermore, it directly drives local economic development and indirectly creates over 1,000 jobs.

